Three old buildings without reliable plans, three ways of using the RS-1.
Illustrative scenarios: the buildings, clients and figures are examples, calculated with the method published on the Pricing page (technician day at €560 excl. VAT, prototype targets). They will be replaced by real customer cases after the pilot programme.
Illustrative scenario, thermal engineering firm
School, two levels, town centre
€4,760 excl. VAT of work and 13 days of lead time saved.
- − 8.5 days
- of work on the survey (10.5 → 2)
- − €4,760 excl. VAT
- of labour cost
- 2 days
- to deliver the plans, instead of 15
Context
- Who surveys
- The thermal engineering firm itself
- Building
- 1960s school, 2 levels, 2,400 m²
- Need
- Energy audit, window replacement
- Difficulty
- Incomplete paper plans. Access on Wednesdays only.
How it goes
- 1
Robot set down on the ground floor.
- 2
Scan during the boiler room inspection.
- 3
Robot carried upstairs: levels aligned.
- 4
Plans and window schedule delivered in 2 days.
Before and with the RS-1
| Criterion | Laser meter and drawing | With the RS-1 |
|---|---|---|
| Time on site | 2 people × 3.5 days | 1 person × 1 day (≈ 4 h of scanning) |
| Plan finalisation | 3.5 days of drawing | 1 day of review |
| Total work | 10.5 person-days | 2 person-days |
| Labour cost (€560 excl. VAT per day) | €5,880 excl. VAT | €1,120 excl. VAT |
| Plans available | After 3 weeks | After 2 days |
Plan delivery time
What makes the difference
- One visit instead of three and a half days on site
- 70 windows surveyed automatically
- Cold areas spotted by thermal imaging (Cloud Pro)
- The saving covers more than two thirds of the robot’s price
Illustrative scenario, 3D scanning provider
Offices, five levels, occupied premises
€4,200 excl. VAT less work, plans delivered in 4 days.
- − 7.5 days
- of work on the survey (11.5 → 4)
- 4 days
- for the plans of all 5 levels, instead of 15
- 0
- employees moved during the survey
Context
- Who surveys
- A 6-person 3D scanning firm, for a property owner
- Building
- 1980s offices, 5 levels, 4,500 m²
- Need
- Up-to-date plans before lease renewals
- Difficulty
- Occupied premises. Partitions changed without plans.
How it goes
- 1
Two to three levels surveyed per day.
- 2
Staff stay at their desks.
- 3
Levels aligned by the staircase scan.
- 4
Plans reviewed and delivered to the owner on day 4.
Before and with the RS-1
| Criterion | Handheld scanner and modelling | With the RS-1 |
|---|---|---|
| Time on site | 1 operator × 4.5 days | 1 person × 2 days (≈ 7.5 h of scanning) |
| Plan finalisation | 7 days of modelling | 2 days of review |
| Total work | 11.5 person-days | 4 person-days |
| Labour cost (€560 excl. VAT per day) | €6,440 excl. VAT | €2,240 excl. VAT |
| Plans available | After 3 weeks | After 4 days |
Plan delivery time
What makes the difference
- No more point-cloud modelling for 2D plans
- The handheld scanner stays free for another job
- The actual partitions, not the archived ones
- Up-to-date areas for the OPERAT certificate
Illustrative scenario, surveyor for a social landlord
Hotel converted into student housing, seven levels
€7,000 excl. VAT of work and a month of lead time saved.
- − 12.5 days
- of work on the survey (16.5 → 4)
- − €7,000 excl. VAT
- of labour cost
- 4 days
- for the plans of all 7 levels, instead of 25
Context
- Who surveys
- A survey firm, for a social landlord
- Building
- 1930s hotel, 7 levels, 84 rooms, ≈ 3,600 m²
- Need
- Feasibility study, then building permit
- Difficulty
- No plans. Purchase decision within six weeks.
How it goes
- 1
Survey over two days, with the caretaker.
- 2
Rooms opened at the robot’s request.
- 3
Robot carried up the stairs: 7 levels aligned.
- 4
Plans with the architect on day 4.
Before and with the RS-1
| Criterion | Laser meter and drawing | With the RS-1 |
|---|---|---|
| Time on site | 2 people × 5.5 days | 1 person × 2 days (≈ 6 h of scanning) |
| Plan finalisation | 5.5 days of drawing | 2 days of review |
| Total work | 16.5 person-days | 4 person-days |
| Labour cost (€560 excl. VAT per day) | €9,240 excl. VAT | €2,240 excl. VAT |
| Plans available | After 5 weeks | After 4 days |
Plan delivery time
What makes the difference
- Plans available before the purchase decision
- 110 windows surveyed: façade can be costed
- Ceiling heights measured everywhere
- The saving exceeds the robot’s price