Some examples of use

Three old buildings without reliable plans, three ways of using the RS-1.

Illustrative scenarios: the buildings, clients and figures are examples, calculated with the method published on the Pricing page (technician day at €560 excl. VAT, prototype targets). They will be replaced by real customer cases after the pilot programme.

Illustrative scenario, thermal engineering firm

School, two levels, town centre

€4,760 excl. VAT of work and 13 days of lead time saved.

Classroom in a 1960s school: the RS-1 drives between the rows of desks and sweeps walls, windows and blackboard with its laser beams; a technician follows the survey on his phone.
Illustration: the RS-1 surveying on site.
− 8.5 days
of work on the survey (10.5 → 2)
− €4,760 excl. VAT
of labour cost
2 days
to deliver the plans, instead of 15

Context

Who surveys
The thermal engineering firm itself
Building
1960s school, 2 levels, 2,400 m²
Need
Energy audit, window replacement
Difficulty
Incomplete paper plans. Access on Wednesdays only.

How it goes

  1. 1

    Robot set down on the ground floor.

  2. 2

    Scan during the boiler room inspection.

  3. 3

    Robot carried upstairs: levels aligned.

  4. 4

    Plans and window schedule delivered in 2 days.

Before and with the RS-1

CriterionLaser meter and drawingWith the RS-1
Time on site2 people × 3.5 days1 person × 1 day (≈ 4 h of scanning)
Plan finalisation3.5 days of drawing1 day of review
Total work10.5 person-days2 person-days
Labour cost (€560 excl. VAT per day)€5,880 excl. VAT€1,120 excl. VAT
Plans availableAfter 3 weeksAfter 2 days

Plan delivery time

Laser meter and drawing15 working days
With the RS-12 working days

What makes the difference

  • One visit instead of three and a half days on site
  • 70 windows surveyed automatically
  • Cold areas spotted by thermal imaging (Cloud Pro)
  • The saving covers more than two thirds of the robot’s price

Illustrative scenario, 3D scanning provider

Offices, five levels, occupied premises

€4,200 excl. VAT less work, plans delivered in 4 days.

Occupied office floor: the RS-1 travels along the aisle between workstations and scans the partitions while employees keep working.
Illustration: the RS-1 surveying on site.
− 7.5 days
of work on the survey (11.5 → 4)
4 days
for the plans of all 5 levels, instead of 15
0
employees moved during the survey

Context

Who surveys
A 6-person 3D scanning firm, for a property owner
Building
1980s offices, 5 levels, 4,500 m²
Need
Up-to-date plans before lease renewals
Difficulty
Occupied premises. Partitions changed without plans.

How it goes

  1. 1

    Two to three levels surveyed per day.

  2. 2

    Staff stay at their desks.

  3. 3

    Levels aligned by the staircase scan.

  4. 4

    Plans reviewed and delivered to the owner on day 4.

Before and with the RS-1

CriterionHandheld scanner and modellingWith the RS-1
Time on site1 operator × 4.5 days1 person × 2 days (≈ 7.5 h of scanning)
Plan finalisation7 days of modelling2 days of review
Total work11.5 person-days4 person-days
Labour cost (€560 excl. VAT per day)€6,440 excl. VAT€2,240 excl. VAT
Plans availableAfter 3 weeksAfter 4 days

Plan delivery time

Handheld scanner and modelling15 working days
With the RS-14 working days

What makes the difference

  • No more point-cloud modelling for 2D plans
  • The handheld scanner stays free for another job
  • The actual partitions, not the archived ones
  • Up-to-date areas for the OPERAT certificate

Illustrative scenario, surveyor for a social landlord

Hotel converted into student housing, seven levels

€7,000 excl. VAT of work and a month of lead time saved.

Corridor of a 1930s hotel: the RS-1, on the floor, sweeps the walls, the open room doors and the ceiling with its laser beams; the stairwell at the far end.
Illustration: the RS-1 surveying on site.
− 12.5 days
of work on the survey (16.5 → 4)
− €7,000 excl. VAT
of labour cost
4 days
for the plans of all 7 levels, instead of 25

Context

Who surveys
A survey firm, for a social landlord
Building
1930s hotel, 7 levels, 84 rooms, ≈ 3,600 m²
Need
Feasibility study, then building permit
Difficulty
No plans. Purchase decision within six weeks.

How it goes

  1. 1

    Survey over two days, with the caretaker.

  2. 2

    Rooms opened at the robot’s request.

  3. 3

    Robot carried up the stairs: 7 levels aligned.

  4. 4

    Plans with the architect on day 4.

Before and with the RS-1

CriterionLaser meter and drawingWith the RS-1
Time on site2 people × 5.5 days1 person × 2 days (≈ 6 h of scanning)
Plan finalisation5.5 days of drawing2 days of review
Total work16.5 person-days4 person-days
Labour cost (€560 excl. VAT per day)€9,240 excl. VAT€2,240 excl. VAT
Plans availableAfter 5 weeksAfter 4 days

Plan delivery time

Laser meter and drawing25 working days
With the RS-14 working days

What makes the difference

  • Plans available before the purchase decision
  • 110 windows surveyed: façade can be costed
  • Ceiling heights measured everywhere
  • The saving exceeds the robot’s price

Become one of our first customer cases

We are looking for 5 to 10 companies for the first real surveys: surveyors, 3D scanning providers, energy consultancies. Your surveys will be used to measure accuracy and publish the first customer cases.